The Way Of Delivery Is Blocked By The Road Construction

28 September 2010

The road between Shaling Village and Yulou Town is blocked because of the expansion of the provincial highway. And this segment of the highway is the only way that transport the raw materials and the finished goods. It influenced the delivery work of G-High seriously, and the leader of G-High has already tried to solve this problem.


Latest Articles

20 August 2025

The Precision Narrative In The Workshop

In the production workshop of G-High Carbon, the relays and wire harnesses inside the electrical ...
19 August 2025

Forged In The Furnace, Crafting "Good To The Last Granule" Core Of Carbon Raiser

Within the G-High Carbon factory, blazing furnace fires ignite the transformative journey of carb...
18 August 2025

The "Fruity Formula" Of G-High Carbon's Factory

The production line still radiates residual warmth, as the carbonaceous aroma of carbon raiser li...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2025 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.