The Way Of Delivery Is Blocked By The Road Construction

28 September 2010

The road between Shaling Village and Yulou Town is blocked because of the expansion of the provincial highway. And this segment of the highway is the only way that transport the raw materials and the finished goods. It influenced the delivery work of G-High seriously, and the leader of G-High has already tried to solve this problem.


Latest Articles

17 October 2025

The Figure Of Responsibility At The Post In G-High Carbon

Within the premises of G-High Carbon, a worker strides with determination toward his post. His fi...
14 October 2025

Quality Inspection Practical Exam Site: Competing On The Precision Track

In the inspection laboratory of G-High Carbon, quality inspectors lean over their workstations, f...
11 October 2025

Customer Traceability At G-High Carbon

Recently, G-High carbon raiser production base welcomed an in-depth customer traceability visit. ...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2025 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.