Discuss Equipment Management Issues

22 January 2025

Recently, the technicians of G-High Carbon have held a comprehensive equipment seminar, aiming to thoroughly analyze the existing problems in current equipment management and explore effective solutions to enhance the operational efficiency and stability of carbon material production equipment.


Latest Articles

16 January 2026

Multidimensional Quality Control: Good To The Last Granule

At the G-High Carbon plant, routine patrols are integrated into the entire production chain of ca...
14 January 2026

Leaning Forward In Focused Writing

Within the premises of G-HIgh Carbon factory, a quality inspector leans forward, bending over as ...
13 January 2026

Production Site Of Carbon Raiser: Hard Work Breeds Warmth

In the factory area of carbon raiser production, the bitter cold of deep winter sweeps through. T...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.