Do Assessment Of Equipment Maintenance

10 July 2024

Today, G-High Carbon completed the assessment of equipment maintenance in order to enhance the team's level of doing equipment maintenance and management and ensure the stable operation of the carbon material production lines.


Latest Articles

24 July 2024

Build Green Enterprise Of Harmonious Coexistence Between Human Beings And Nature

As a professional carbon material manufacturer, G-High Carbon not only provides high-quality spec...
23 July 2024

Accurately Meet Customers’ Needs

Recently, the Production Department has successfully met the customers’ strict requirements for t...
22 July 2024

Manage Trucks Rationally and Efficiently

At 8:00am, there were already several trucks waiting outside the factory to be loaded. The man in...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2024 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.