Do Inspection Of Night Production

19 February 2024

At 22:37, the staff on post of G-High Carbon was doing the production inspection so as to ensure the smooth operation of the production lines and timely delivery of carbon materials.


Latest Articles

12 April 2024

Meet Customers’ Needs Attentively

Today a batch of specialized carbon materials will be sent to the customer after it has been test...
11 April 2024

Walls Were Repainted In G-High Carbon

Recently G-High Carbon painted the walls of the workshops, and the whole factory looked quite bri...
10 April 2024

Upgrade Power Distribution System Recently

G-High Carbon introduced advanced intelligentized equipments and technology to upgrade the origin...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2024 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.