Do On-site Inspection

26 January 2024

At 11:30 of January 17th, the manager of the Production Department inspected how the production had been completed and strengthened the on-site management so as to ensure the high quality delivery of carbon materials.


Latest Articles

12 February 2026

G-High Carbon Raiser: Re-engineering The Performance DNA Of Compressor Housings

Through molecular-level precision in carbon structure modulation, we infuse compressor core housi...
11 February 2026

Inspection

Inside the production workshop of G-High Carbon raiser, the client moved slowly along the product...
05 February 2026

Precision-Controlled Carbon Raiser Production

In the central control operation area of G-High Carbon, technicians focus intently on the array o...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.