G-High Complete Emergency Switch Drill Of Backup Power

28 January 2022

Today G-High Carbon completed the emergency switch drill of backup power, which improved the ability to deal with sudden power failure and helped to ensure the continuous and stable operation of carbon raiser production line.


Latest Articles

17 June 2026

Exploring Industrial Heritage, Carrying Forward The Industrial Spirit

In June 2026, G-High Carbon organized frontline staff from its carbon raiser production departmen...
16 June 2026

Time Keeps Its Order, Craftsmanship Holds Its Measure

As I bend over the carbon raiser production equipment, the cold hardness of metal blends with the...
15 June 2026

G-High Carbon Visited The Foundry Hall Of China Industrial Museum

Standing in the foundry exhibition hall, the heavy industrial castings tempered by time tell the ...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.