G-High Upgrades And Rebuilds Power Distribution System

07 June 2021

After rounds of discussion, G-High designed and carried out the plan for the upgrade and reconstruction of power distribution in order to fully optimize the power system. It improves the electricity management level and ensures the efficient and stable operation of the carbon raiser production line. 

 


Latest Articles

07 September 2026

Thriving In Autumn’s Glow

The autumn sun gently falls upon the window ledge, where the security guard’s potted cactus burst...
03 September 2026

Routine Inspections

A dense web of cables conveys the operational data of the equipment. The staff of G-High Carbon m...
02 September 2026

The Yield-rate Game Deep In The Furnace

The battle over automotive panel quality has long extended into the steelmaking furnace. Carbon r...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.