G-High Upgrades And Rebuilds Power Distribution System

07 June 2021

After rounds of discussion, G-High designed and carried out the plan for the upgrade and reconstruction of power distribution in order to fully optimize the power system. It improves the electricity management level and ensures the efficient and stable operation of the carbon raiser production line. 

 


Latest Articles

21 January 2026

The Resilience Of A Runner Tempering The Foundation Of A Career

Like a marathon runner with a decade of perseverance, Manager Leow of G-High Carbon has infused t...
19 January 2026

Safety Color At Carbon Raiser Production Site: Yellow

Across the G-High Carbon worksite, bright yellow guardrails and warning lines stand out in variou...
16 January 2026

Multidimensional Quality Control: Good To The Last Granule

At the G-High Carbon plant, routine patrols are integrated into the entire production chain of ca...

Send an Email. All fields with an asterisk (*) are required.

Call us at (+86) 139-4278-7316 Or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.and we will get back to you within 24 hours.

Please type your full name.
Invalid email address.
Please type your phone number.
Invalid Input
CAPTCHA
Refresh Please enter the correct verification code.
Copyright © 2026 Panjin G-High Carbon Materials Co., Ltd. All Rights Reserved.